Playground Replacements Project No. 101649

Closed September 29, 2022, 01:30 PM

  • Reference number101649
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following: the demolition and removal of 7 playgrounds at 7 different sites and the installation of 7 new playgrounds at each site. Other scope items include site grading, playground drainage, concrete flatwork and the installation of steps, ramps and handrails is also included in the scope of work.

Project Name: Playground Replacements at CP Handley, Candleridge, Daggett, Lake Como, Overton, Southwest, and Westcreek Park

Project No.: 101649

Dates of Bid Ad:  1st Ad on 09/01/2022,  2nd Ad on 09/08/2022

Pre Bid Web Conference:  09/15/2022 @ 1:00 P.M. CST

Invitations with links to the web conferencing application will be distributed to those who have submitted an Expression of Interest

Date of Bid Opening: 09/29/2022 @ 2:00 P.M. CST

BIM 360 Bid Document Public Shared Link:

 https://docs.b360.autodesk.com/shares/6b81ba79-e6c7-41f4-a1a1-bd98f6fa6694