2021 Bridge Rehabilitation Contract 1

Closed July 22, 2021, 01:30 PM

  • Reference number103098
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following:

    65 LF Rail (TY PR11)
    70 LF Handrail
    189 LF Replace Steel Rail
    75 LF Metal W-Beam
    73 LF Concrete Crack Repair
    678 SFT Concrete Structure Repair