2023 Concrete Restoration Contract 2

Closed September 01, 2022, 01:30 PM

  • Reference number104179
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following:

    10,500 SY Remove and Replace 7” Concrete Pavement HES
    4,500 SF Remove and Replace 6” Concrete Driveway
    3,000 SF Remove and Replace 4” Concrete Sidewalk