Sycamore Creek Relief Interceptor, Phase 3

Closed March 04, 2021, 01:30 PM

  • Reference number102069
  • StatusOpen
  • SummaryThis project consists of laying a sanitary sewer collector main 42-inch to 66-inch in diameter in the Sycamore Creek Drainage Basin.

This project consists of laying a sanitary sewer collector main 42-inch to 66-inch in diameter in the Sycamore Creek Drainage Basin. The project extends from a start point in Sycamore Park just south of Vickery Boulevard  to an end point just south of Hwy 287.