The Fort Worth City Cable Channel (Charter/Spectrum channel 190) will be offline for a few weeks starting March 11 while facilities connections are being rerouted. You can watch City meetings on the City’s LiveStreams or on our YouTube Channel.
The Downtown Resurfacing involved the downtown streets referenced in the 2023 Street Resurfacing map(PDF, 198KB).
Resurfacing streets with two inch overlay and re-striping has occurred. A longer-lasting asphalt called Super Sand Mix is being used to increase the overall pavement performance.
Council District: 9
500 Houston Street, Fort Worth 76102 View Map
500 Houston Street , Fort Worth 76102
Final Construction
April 2024
104184