West Wind Apartment Water and Sewer Improvements

  • Project typeWater and Wastewater Improvements
  • Project value$527,000
Water & Sanitary Sewer Imrpovements

A water line and sanitary sewer line - located in an easement in the West Wind Apartment complex at 4300 Old Benbrook Road – will be replaced. The complex is bound by Pensacola Avenue to the north, Old Benbrook Road to the east, Ewing Avenue to the south and businesses to the west that front Benbrook Boulevard/Hwy. 377.

The existing 6-inch in diameter ductile-iron water line between Pensacola and Ewing will be replaced with an 8-inch in diameter HDPE pipe using the pipe enlargement method.

The existing 6-inch in diameter concrete sewer line between Pensacola and Ewing will be replaced with an 8-inch in diameter HDPE using the pipe enlargement method. 

This project is in Council District 3. Construction will impact the Bomber Heights neighborhood association. 

Construction is slated to start on April 10, 2023. 