Westside IV Transmission Main – Aledo Rd to WSIV EST

Closed April 20, 2023, 01:30 PM

  • Reference number103292-3
  • StatusOpen
  • SummaryThis Westside IV Transmission Main – Aledo Road to Westside IV EST (CPN 103292-3) is one part of a three-part job.

The major work will consist of the (approximate) following:

  • 12,890 linear feet of 36-inch water line by open cut,
  • 446 linear feet of  60/54-inch steel casing pipe or tunnel liner plate with 36-inch carrier pipe by other than open cut, and
  • 90 linear feet of  24-inch water line by open cut.