Thomas at Calmont Storm Drain Rehabilitation

  • Project typeDrainage Improvements
  • Project value$2,093,000
Drainage Improvements

The existing storm drain pipe at Thomas Place and Calmont Avenue is deteriorating and crosses residential lots. It will be relocated to within the City right of way and the existing pipe will be taken out of service. 

Design is on-going and expected to be completed in March. Subsurface utility engineering will be taking place in the project limits in the next 30 days and 90% design submittal is expected. Bid documents are being prepared in preparation for construction advertisement. 

 

Last update: March 2023

 

Project meetings

  • There are no upcoming meetings at this time.

Project news

  • There is no project news available at this time.