This project is a multi-phase project to reduce flooding in the Westcliff South drainage basin. The first phase included installation of pipe inlets on Surrey Street from Suffolk Drive to Seminary Drive. The second phase included construction of storm drain pipe in Suffolk Drive from Winfield Ave to Surrey St. and storm drain pipe in Seminary Dr from Surrey St. to Stadium Drive. The final phase that is about to begin construction will install large diameter pipes and storm drain inlets west of Granbury Road and will outfall at Foster Park.
Water and sewer construction on W. Seminary Dr. is complete. Some street, curb, and gutter repairs remain but will be completed this summer. Water and sewer construction continues on Cherokee Trail.
In the next 30 days, expect Contrerra cable relation to begin on Trail Lake Drive as well as water and sewer construction.
Construction on phase 2b is complete
Council District: 3 & 9
4250 Surry Street, Fort Worth 76133 View Map
4250 Surry Street , Fort Worth 76133
Phase 1: Construction
Phase 2: Complete