FY 2018 Safe Routes to School Improvements

Closed September 16, 2021, 01:30 PM

  • Reference number101264
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following: sidewalk, curb ramps and driveways in the north area of Fort Worth around Diamond Hill, Bonnie Brae, and W.J Turner Elementary Schools. Major work items include (approximate):

    17,329 SY 4” Concrete Sidewalk
    321 EA Barrier Free Curb Ramps
    7,724 SY 6” Thick Reinforced Concrete Pavement