Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1

Closed November 10, 2022, 01:30 PM

  • Reference number102652
  • StatusOpen

Phase 1 of the Village Creek Water Reclamation Facility Digester Mixing, Flare and Dome Improvements will include the following major work items:

  • New pumped mixing systems, overflow box repairs, and dome rehabilitation for Digester Nos. 1-6
  • New gas safety equipment for Digester Nos. 1-14
  • Digester Control Building No. 1 electrical switchgear improvements including architectural rehabilitation and replacement of HVAC
  • Two new digester gas flares, a condensate vault, and 30-inch low pressure digester gas pipeline
  • A new, three-vessel hydrogen sulfide removal system
  • Two new refrigerate gas dryers and chillers
  • Additive alternate bid items, including:
  • dome rehabilitation for Digester Nos. 7-8,
  • replacement of electrical transformers PA9 and PA10 including switchgear, and
  • brick investigation and repairs at Digester Nos. 1 – 6