Marine Creek Parallel Sewer Interceptor Improvement Project

  • Project typeWater and Wastewater Improvements
  • Project value$26,324,580.00
Water & Sanitary Sewer Imrpovements

New sanitary sewer and water mains will be installed in streets, alleys and easements in an area bound by NE 23rd Street to the north, Cold Springs Road to the east, NE 12th  street to the south, and Mule Alley – south of the Stockman Club and the Fort Worth Stockyards - to the north and west. The rehabilitation parallels the Burlington Northern Santa Fe Railroad, Marine Creek and NE 23rd Street.

 

This Fort Worth Water capital improvement project includes:

  • Design of a proposed 42-inch in diameter sewer interceptor that would parallel the current  42-inch to 48-inch sewer interceptor. The current sewer interceptor runs north from East Northside Drive to south of NE 23rd Street along the Burlington Northern Santa Fe Railroad  right of way and Samuels Avenue, then west on NE 23rd Street from Samuels Avenue to Mule Alley;
  • Design of a 68-inch to  72-inch in diameter sewer interceptor that would parallel the current 69-inch in diameter sewer. The current interceptor runs south of East Northside Drive, perpendicular to the Burlington Northern Santa Fe Railroad and under the right of way;
  • Design for the rehabilitation of the existing sewer interceptor (the 42-inch in diameter interceptor south of NE 23rd street and the 24-inch in diameter interceptor in NE 23rd Street);
  • Design of the proposed 12-inch water line on NE 23rd Street from Samuels Avenue to Mule Alley.

 

The impacted streets and easements include:

Fort Worth Council District 2

  • NE 23rd Street from Mule Alley to Samuels Avenue Drive (water and sewer)

 

Fort Worth Council District 2 and Fort Worth Council District 9

  • Samuels Avenue from NE 23rd Street to  East Northside Drive (sewer)

 

Fort Worth Council District 9

  • East Northside Drive from Samuels Avenue to 200 linear feet east of the railroad  (sewer)
  • Samuels Avenue from North Park Drive to NE 12th Street (water)
  • NE 12th Street from Samuels Avenue to the Burlington Northern Railway right-of-way (water and sewer)
  • NE 13th Street from Samuels Avenue to the Burlington Northern Railway right-of-way (water and sewer)
  • NE 14th Street from Samuels Avenue to the Burlington Northern Railway right-of-way (water and sewer)
  • NE 16th Street from Samuels Avenue to the Burlington Northern right-of-way (water and sewer)
  • NE 17th  Street from Samuels Avenue to the Burlington Northern right-of-way (water and sewer)
  • Easement between Samuels Avenue and the Burlington Northern Railroad right-of-way from 12th Street to 1,690 feet north (sewer)
  • Easement north of North Park Drive from  Samuels Avenue to the Burlington Northern Railroad right-of-way (sewer)

 

Construction may impact customers in the Fort Worth Downtown Neighborhood Alliance, Inter-District 2 Alliance and North Side neighborhood association area. 

Project Meeting

 

Project News

 

Location

E. Davis Avenue at Belzise Terrace, Fort Worth 76104  View Map

Google Map