The major work will consist of the (approximate) following:

Constructing new water and sanitary sewer mains and paving.

 

Unit 1: Water Improvements

5623 LF – 8” PVC Water Pipe

6918 LF – Temporary Asphalt Paving Repair

81 EA – 1” Water Service

26 EA – 8” Gate Valve

 

Unit 2: Sanitary Sewer Improvements

3 EA – 4’ Manhole

200 LF – 8” Sewer Pipe

8 EA – Manhole Adjustment, Major w/ Cover

 

Unit 3: Paving Improvements

31660 SF – 4” Concrete Sidewalk

9643 SF – 6” Concrete Driveway

15040 SY – 6” Conc Pvmt

16125 SY – 8” Lime Treatment

500 SY – Pavement Pulverization (11”)

610 SY – 3” Asphalt Pvmt Type D

 

Unit 3: Paving Improvements Alternate A (POL)

13215 SY – 3” Asphalt Pvmt Type D

10128 LF – 6” Conc Curb and Gutter

13955 SY – Pavement Pulverization (11”)

 

Unit 4: Stormwater Improvements

143 LF – 21” RCP, Class III