Comanche Trail Hazardous Road Overtopping Mitigation

Closed July 07, 2022, 01:30 PM

  • Reference number103396
  • StatusOpen
  • SummaryThe major work will consist of the (approximate) following: Replacement of 48” storm drain with 2-32’X8’ arch culverts. The roadway is to be realigned and widened to 41’ with the addition of 5’ wide sidewalks on each side.