The Fort Worth City Cable Channel (Charter/Spectrum channel 190) will be offline for a few weeks starting March 11 while facilities connections are being rerouted. During the outage, you can watch the City Council Meetings and other City meetings on the City’s YouTube Channel.
Portions of the existing wastewater collection system serving the Village Creek Wastewater Basin are at capacity. Increased capacity is necessary to handle projected growth within the basin, which also includes the wholesale customer cities of Burleson and Crowley.
The Lake Arlington Lift Station Gravity Main has two parts, the downstream gravity main and the upstream gravity main. The design includes a 5,000 foot 78-inch sewer main (upstream gravity main) as well as a 3,000 foot 60-inch sewer main (downstream gravity main) that would tie in to an existing 60-inch sewer main near the intersection of Cooks Lane and Lancaster Avenue.
The construction summary FAQs - in English and Spanish - have been added to the Related Information sidebar on this page.
Part 1 - Construction
Part 2 - Construction
Part 1 - July 2024
Part 2 - July 2024
101311