The Southside II Water Main Alignment Study focuses on the alignment of a proposed water transmission main that would stretch from Oak Grove Shelby Road in Fort Worth, south to Alsbury Boulevard in Burleson.
The proposed 48-inch in diameter water transmission main would extend from an existing 54-inch in diameter steel water main in Oak Grove Shelby Road and cross an existing 16-inch concrete water line in Burleson, west of I-35W.
The proposed alignment is bound by Oak Grove Shelby Road to the north, Alsbury Boulevard - in Burleson - to the south, East Main Street at Rendon Crowley Road - in Crowley - to the west, and Camden Yard Drive at Silver Mist Trail to the east.
This project is in Fort Worth Council District 6, Fort Worth Council District 8, and the cities of Burleson and Crowley.
This project will provide increased reliability for increasing future growth in the south Fort Worth area as well as the customer cities of Burleson and Crowley and Bethesda Water Supply Corporation.
11801 S Freeway, Other 76028 View Map
11801 S Freeway , Other 76028
Part 1 - Preliminary Design
Part 2 - Preliminary Design
Part 3 - PreliminaryDesign
Part 4 - Conceptual Design
Part 5 - Preliminary Design
Part 1 - March 2027
Part 2 - February 2026
Part 3 - April 2026
Part 4 - April 2026
Part 5 - February 2026