Northside IV 24-Inch Water Transmission Main Phase 1B

Closed November 10, 2022, 01:30 PM

  • Reference number102687
  • StatusOpen

Phase 1B of the Northside IV 24-inch water transmission main will extend from Heritage Trace Parkway, just west of Business Highway 287, to Bonds Ranch Road. The major work includes:

• 9,120 linear feet of 24-inch DIP, steel AWWA C200 or concrete AWWA C303 water line by open cut

• 1,170 linear feet of 24-inch DIP, steel AWWA C200 or concrete AWWA C303 water carrier pipe

• 1,100 linear feet of 42-inch steel casing pipe by other than open cut

• 80 linear feet of 42-inch steel casing pipe by open cut

• 60 linear feet of 16-inch water pipe by open cut

• 70 linear feet of 12-inch water pipe by open cut

• Design and construction of cathodic protection system

• Flow transfer station