Trail Gap Connections include 2 trails: Buck Sansom Trail and Arcadia

Closed October 21, 2021, 01:30 PM

  • Reference number101632
  • StatusOpen
  • SummaryTrail Gap Connections include 2 trails: Buck Sansom Trail and Arcadia Trail South. The major work will consist of the (approximate) following: demolition of existing sidewalk, earthwork, seeding & sodding at disturbed areas, concrete paving of 10’ wide pedestrian trail, trail sings and traffic signals.

 

Trail Gap Connections Project No. 101632

Date of Pre-bid Web Meeting:   Oct 7, 2021 @ 10am -11am

Meeting Link:  https://fortworthtexas.webex.com/fortworthtexas/j.php?MTID=m18101eb1f7a48afc134b8d38e7793aa7

Meeting number (access code): 2555 012 4014

Meeting password: AFkRrSpP527

BIM 360 Link:   https://docs.b360.autodesk.com/shares/5c0a0df8-efb6-48c5-84b6-3a04595d59f9