Cromwell Marine Creek Road Widening Improvements Request For Proposals

Closed July 07, 2022, 01:30 PM

  • Reference number101012
  • StatusOpen
  • SummaryThis is a one-step CMAR solicitation process. The proposal shall contain all information as called for in the Request for Proposal. Based on the information contained in the proposals and potential interviews, the City will evaluate and select a proposer that provides the best value to the City.

The project consists of the reconstruction of 2.11 miles of Cromwell Marine Creek Road from Boat Club Road to Marine Creek Parkway. The project includes 6’-10’ sidewalks and shared used paths, streetlights, 20” ductile iron water line relocation, 4- lane divided (4-11’) commercial and neighborhood connector road with the ability to reduce median and widen to 6-lane in the future. The project includes conversion to curbed road with enclosed drainage system with inlets and upsized culverts; modification of existing traffic signal at Boat Club Road and Huffines Boulevard and new traffic signal at Bowman Roberts Road and Crystal Lake Drive. A 201’ span concrete bridge over Marine Creek on the east side of the project and modifications to the existing roundabout at Marine Creek Parkway. All work will be performed within City and TxDOT right-of-way and easements.