The Downtown Resurfacing 2023 project will resurface downtown streets referenced in the 2023 Street Resurfacing map(PDF, 198KB).
Resurfacing will include a two inch overlay and re-striping. Select curb ramp replacement is also included. A longer-lasting asphalt called Super Sand Mix is being used to increase the overall pavement performance.
PLEASE DO NOT PARK AT COVERED PARKING METERS IN CONSTRUCTION ZONE. CARS WILL BE TOWED.
Paving activities for the project are in the last phase (Phase 4). Weather permitting, work will be complete before mid-November. but little behind on schedule. Per revised schedule all paving work is expected to be completed by mid-November 2023, weather permitting.
The pavement marking is also in progress in many areas, and is expected to complete by end of November 2023. Please be cautious while driving as temporary striping tabs are not aligned with proposed plan in some areas. Staff is working with contractor to correct the issue.