Harriet Creek Ranch Street Project

  • Project typeStreet & Transportation Improvements
  • Project value$900,000
Street & Transportation Improvements

The Transportation and Public Works Department has rehabilitated streets in the northwest part of town at Harriet Creek and Highway 114. The project repaired concrete panels, damaged sidewalks and driveways within the project limit. 

 

Streets that will be rehabilitated include:

• Cowboy Trl From Red River Ln To Wild Horse Way

• Cowboy Trl From Copper Mountain Dr To Jasmine Springs Dr

• Creek Crossing Dr From Cowboy Trl To Red River Ln

• Diamond Lake Trl From Woodside Dr To Pinery Way

• Ford Oaks Ln From Foxfield Way To Diamond Lake Trl

• J. Cheshier Rd J. From Windthorst Way To Ford Oaks Ln

• Jasmine Springs Dr From Arbuckle Dr Shasta View Dr

• Jasmine Springs Dr From Rialto Wat to Baxter Springs Dr

• Kittredge Way From Windthorst Way To Ford Oaks Ln

• Ramada Trl From Cowboy Trl To Abilene Dr

• Red River Ln From Creek Crossing Dr To Lariat Dr

• Riverchase Ln From Riverchase Ln To Red River Ln

• Shasta View Dr From Jasmine Springs Dr To Ford Oaks Ln

• Shawnee Trl From Martin Ranch Rd To Shawnee Trl

• Thorntree Ln From Diamond Lake Trl To Pinery Way

• Trego Dr From Thorntree Ln To Pinery Way

• Windthorst Way From Elk Lake Trl To Diamond Lake Trl

• Woodside Dr From Baxter Springs Dr To N Dead End

• Woodside Dr From Carolina Ridge Way To Rialto Way

 

This project is located in Council District 10.

Project meetings

  • There are no upcoming meetings at this time.

Project news

  • There is no project news available at this time.

 

Location

16337 cowboy trail, Fort Worth 76247  View Map

Google Map